3.5 collate all the information submitted and to preserve the record for the original records, record data must be true. 3.5.1 inspectors collect all the inconsistencies Ordnance Disposal documents, such as NCR, repair, re-examining the reports and records QC engineer will be able to access this information for AI audit. AI 3.5.2 test point in the investigation, trial records to be completed in one day, Process engineers from verified before handing over QC engineers. 3.5.3 After the assembly, and manufacturing process engineers will be assembled in the course of relevant text collected complete, norms, the transfer of archives. 3.5.4 After the assembly, QC engineers of the manufacturing assembly created in the course of documents related to the quality of the collection, collation, Pre-Filing and transfer of archives. 3.5.5 various Frederick, the collection of the test report should at least include, but are not limited to the following : 3.5.5.1 process flow diagram (with labeled AI) 3.5.5.2 testing processes card NDT report 3.5.5.3 3.5.5.4 3.5.5.5 pressure test report inconsistent with the report - See the "ultimate test procedures", "document control procedures" 3.6 boiler introduction Stamping 3.6.1 In addition to the whole boiler introduction of the boiler factory Stamping, I should be the introduction of the Stamping and my company's name or allow the use of the initials EPTC. 3.6.2 whole boiler has been tested in accordance with the regulations and pressure tests, I authorized in the presence of AI examiner and recognized circumstances, Stamping nameplate will be the main boiler installed at the site, the company Stamping introduction of the boiler manufacturer Stamping near the site, before authorizing the examiner AI assembled on site inspection certificate signed column.
|